Showing posts with label process. Show all posts
Showing posts with label process. Show all posts

Saturday, January 14, 2012

Primed for Painting

We drove down to the house today so Niels could see the paint progress. There were a few people visiting with Todd, our GC, so it was fun to show them around and answer questions and explain why we've done what we have. Joe's cabinets were a big hit!

In the last two days, a lot of staining and clear coating got done.

The foyer niche bench:

Close up with the beautiful grain
Big pictures view
 Stair Hand Rail and Kitchen Trim:

In-Law Suite Vanity:

Pantry Door:

Mudroom Locker Shelves and Tub Surround Panels:

Stair Rail:

All that's left for staining is the mudroom lockers and in-law vanity drawers, which are currently at the carpenter's shop. Hopefully, they'll arrive on Monday to be done.

My mom reminded me that the most time-consuming part of painting is the prep work. So for the first few days, the crew did a lot of caulking, hole filling, smoothing, and taping. Then, they moved on to the trim. We went with Sherwin Williams Pure White for our trim. It's a nice bright white.

Pure white snow and Pure white sill.
Nice deep ICF sill under a nice warm Low-E window.
And now, the best part: COLOR! As part of our contract, we had an allowance for six Sherwin Colors, plus a trim color. In addition to the Pure White trim, we chose Oyster Bay (a grayish-green), Dovetail (a dark gray), Mindful Gray (a light gray), Sensuous Gray (a plumish gray), and for our son, Scanda (boyish blue) and Solaria (yellow). All of our paint is zero-VOC for clean, healthy air quality.

We ended the week on a high note, with the first room painted. Here's our son's Scanda blue bedroom with Solaria yellow closet. Our son just turned three. The nook to the right will be his super special secret hiding place, with a little help of a curtain and rod. When he's a bit older, we'll turn it into an indoor tree house, and when he's a lot older, it will be a desk area.

This is the view of his room from the closet looking out. 

By next weekend, most of the paint should be done, and possibly some of the porcelain tile and luxury vinyl tile (LVT). The flooring is ready for us at Northport Flooring America, but we want to make sure it isn't painted! Our appliances are also ready for us at MAS. Most of our fixtures have arrived, but we'll pick out the last choices this weekend. Joe Yoder will be back on the 19th (five days) to raise the command center desk a little bit and deliver the last of his trim work (the laundry cubbies, mudroom locker door, and baking center support).

We're at the point where everything is the last thing, so Todd has quite the dance card to arrange. He'll be working on a schedule soon. We're still hoping to be in by Valentine's Day. Our corporate housing apartment is pricey and we're getting antsy to be in our new home!

Saturday, December 17, 2011

Build - Day 159 - Kitchen being installed

After years of planning, months of shopping around and weeks of looking forward (and following) the build process of our new Amish-build custom kitchen last week they were finally being installed. On Wednesday-morning our kitchen builder, Joe Yoder of Yoder Cabinet started installing the cabinets and by that evening all the main kitchen cabinets have been installed.

We choose maple wood, in a shaker-style, in espresso with metal pulls, full extension, soft-close, dove-tail drawer boxes and a few custom items such as an oil/wine cubby cabinet, two tip-out drawers and a recycling -center. Our cabinet maker used all Blum hinges. The result is truely stunning and pretty much exactly what we've been looking for.

A couple of items still need to be done:
  • Comand Center; coming in 2 weeks
  • Baking Center; coming with the countertops
  • Clean-up island cover; goes on after minor electrical changes
My wife has made two comprehensive posts, one just prior to this one here on the blog and one on one of the most popular online building forums GardenWeb - Kitchen Section. Links will open in a new window. You can also find two overview shots at the end of this post as well.

After seeing his work we've had various requests of people on Joe Yoder's contact info. He does Kitchens, Baths, Furniture, Fireplace mantels, etc... Basically, whatever you need made. You can contact him at:

Joe Yoder Cabinet
7690 Hoy Road
Fredrickburg, OH 44627
P: (330) 763-0269
F: (330) 695-2126

In two days the non-kitchen cabinets will be installed as well. Next up will be the flooring, plumbing (installing toilets, faucets, etc...) and painting. Looking at an early February move-in.


Thursday, December 15, 2011

Kitchen cabinets installed!!!

Today was a very exciting day for us. We went back to the house--which is a bit more of a drive now that we're settled in our apartment--to the mostly finished installation of our kitchen cabinets! It's not completely done because there are a few electrical issues that need to be addressed before the front panel of the outer island goes on, and the marble top baking center will be added in a few weeks with the rest of the countertop, but other than that, our kitchen cabinets are installed!

As a little background, I love to cook so the kitchen was a top priority to me. Since I live with a brain injury, we put a lot of thought into using as much universal design as we can afford. The floors will be cork for greater sound proofing, which means my son will finally be able to have playdates. (Hardwood floors are terrible for my headaches. So happy to be rid of them!). We'll have extra wide halls, rockers instead of light switches, levers and pulls instead of knobs, a raised dishwasher, lots of drawers for base cabinets, touch activiated faucets, etc. We tend toward function over form, but really wanted an accessible kitchen that was more transitional/modern than nursing home!

This was our rendering as of several months ago. We've made a few changes.The command center in the nook is a little different, with open shelves on top, and doing away with the desk extension on the left. We've also added arches over the command center and wall by the frig into the mudroom. The pantry door will be espresso framed with frosted glass. This view is from the dinette.

Rendering:



Reality:
I see that I need to go back and get a better shot. The first picture is from December 15, the second picture is from the 14th. The legs on the first picture show approximately where the open lowed baking center will be.



Here's the view from the great room. The big change here is that we took down the wall with open shelves to take advantage of all the fantastic natural light from the dinette.

Rendering:

Reality:

This view is from the command center, looking into the dinette and great room. Again, the only change is the wall with the open shelves is gone.

Rendering:

Reality:
 

And now for a little detail.

The cabinet are solid maple shaker style with espresso stain. They look almost black, but they are really a rich brown. This is pretty color-accurate. 
 All of the drawers are full extension, including these super wide drawers by the baking center. 


All the drawers and cabinets are soft close with Blumotion, another way to reduce noise in the house.


Joe Yoder did a fabulous job. We are so impressed with his quality. The dovetails are perfectly smooth.

The shelves are perfectly smooth and lined up with the frames.

Hardware. We chose pulls over knobs for ease of use as we age in place.
Molding:

Frig surround. We chose to keep the top open rather than put doors on because I'm only 5'4" and have never used a cabinet above my frig. Instead, I'l have two baskets, one for our first aid kit and one with our cleaning supplies (out of the reach of our toddler). 


Next to the frig is a stack of drawers. We made the second drawer a bread drawer because I love to make bread, and Niels love to eat bread! (He can go through a loaf every day or so!)
Continuing left is the cooktop, with three big drawers underneath it. The top drawer is a shallow one, which I"ll use for spices and wooden spoons. The other two drawers and nice and deep for pots and pans.


Next up is a row of cubbies for my cooking oils and wines. This was my cabinet maker's idea for the space instead of a dead space filler. I love it!

On either side of the cooktop we have upper cabinets with frosted glass. They're still a bit dusty.
One thing I really appreciated is the way the glass is sealed. In our last kitchen, our glass cabinets rattled whenever you closed them. Between the soft close and the seal, it's nice and quiet!

In the corner, we have a lazy susan.

I didn't take a good picture, but here is (part of) the corner cabinet above the lazy susan:

 Next to the lazy susan is the microwave drawer with deep drawer underneath. There's also a cabinet above the counter.


Next to the microwave is the double oven, which is a nice height for me, that is, lower than a typical double oven. This allowed room for racks above it for storing cookie trays and cutting boards. There's also a small drawer below for my bread pans.

Next to the wall ovens is a bank of drawers that I'll use for all my baking things. The drawers turned up a lot wider that I had imagined, so there's a good chance that I may use a drawer for our board games or our son's toys. The top of the counter will be the new home for my brand new Kitchen Aid mixer. I've wanted one forever, and Niels found a killer deal on Black Friday. Instead of the full wall with open shelves we originally planned, it'll be a half wall into the dinette. We needed the half wall for the Kitchen Aid's outlet.

Next to the bank of drawers will be my open lowered baking center. We designed it to accommodate a wheelchair, if needed.  But we can always use it for kneading dough and rolling out cookies--which I'll now be able to do without standing on my tippy toes! And, there's room for our son (and a friend) to help! We were planning to put the same quartz on the baking center as the rest of the counter, with a piece of marble on my wishlist for someday. An unexpected surprise is that when we looked at remnants for the bathroom vanities, we found a slab of carrara marble that was just the size we needed.

The inner island will be my prep island. Here's a view of it from the cooktop side. From the left, there's the recycling center, in the middle is an adjustable shelf that once again makes clever use of some dead space. I'll use this space for paper towels and wipes. On the right will be the prep sink with a tip out drawer and cabinet below.


This is the other side of the prep island. There are two banks of drawers where we'll keep most of our dishes, and then rest of the recycling center. You can see the built in dividers for utensils and silverware in the top drawers.

View of the utensil drawer:


This is our touch-activated recycling center. It uses Blumotion. It is a much improved version of the idea I got at Ikea about a year ago.

Here's the inside of the recycling center. The two bins on the bottom are for trash and glass/plastic recycling. The top drawer will hold two baskets, one for paper recycling and one for odd recycling, like light bulbs and batteries. We wanted to make it really easy for family and friends to recycle by having everything in one place.

This is the Blum servodrive that opens the recycling center with a gentle push.


Finally, this is the entertainment/clean-up island. From the right, there's a bank of drawers, single bowl sink cabinet and dishwasher. We raised it a little bit to make it easier to unload.

Both sinks have Rev-a-shelf tip out drawers for my gramma's scrubbies.

This is the outside of the entertainment island. We'll have three bar stools here.

The panel for the outside island isn't installed yet because there are a few electrical tweaks that need to happen first. 

The command center should be installed in a few weeks, and the pantry furniture will be moved in after painted.

I can't wait to get cooking!
Related Posts Plugin for WordPress, Blogger...