Tuesday, July 19, 2011

Build - Day 8 - July 19, 2011 - Part II

A couple of hours makes a big difference. Even with what the National Weather Center has now confirmed as a 1000yr storm we managed, with only a 3hr delay, to have all the water out by 1pm, have the foam again resting on the foundation and the walls have been realigned. Also, all of the holes for the inside/outside connections (think spigots, gas lines, vent openings, etc...) are in and the cement trucks have arrived.

A little after 1.20pm the concrete started pouring so we will NEVER have those 'interesting' floating walls again. At 3:30pm all was done and we now have solid concrete from the footers all the way up the walls. Tomorrow the main item is the highly interesting ... curing of the concrete... ;-)

Maybe the masons make it tomorrow for stacking the porch walls but otherwise tomorrow will be a nice low-key day. Thursday the frenzy will continue again.

1pm view, all the water is gone... Yes!
Our Charis Homes GC (General Contractor) found some mud... Hard to miss today ;-)
Good shot of who much water was pumped out.
The main goal of today is still being accomplished... pouring the concrete!
3 cement trucks waiting, I passed the 4th on the way home... Gonna be a solid house!!
Concrete is in... 4 trucks full...
Rebar in on top for the next floor, pins in on the inside to hold the floor I-joists and  the floor supports on the outside for the garage floor and porches.

Build - Day 8 - July 19, 2011 - Part I

The title of this post should have been 'a soggy mess' with a massive rain storm drenching the area last night. It also did some damage to the construction site as the dig doesn't have its drainage in and the foam ICF blocks aren't bonded to the foundation yet.

So, what happens when foam hits water.... it floats. Our back basement wall is now a bit higher than the rest of the build. The reason it's only that wall is that the back wall is where they had to dig down the furthest to remove a layer of clay so all the water naturally goes to the lowest point.

To put things in perspective, according to the Akron-Beacon Journal, the officially recorded 7 inches of rain in downtown Akron just 15mins north qualifies as a 1000-yr storm.

That being said, pumps are being brought in as we speak to pump the water out of the hole, re-straighten the ICF blocks and get it ready for the concrete so the walls are solidly connected to the footers and will never be able to rise again.

Before the storm...
After the storm...
Before the storm.
After the storm.
Before the storm.
After the storm.

Monday, July 18, 2011

Build - Day 7 - July 18, 2011

Today they have finished up stacking and bracing the basement wall ICF blocks and tomorrow between 10am and noon they will pour the concrete. With the heatwave and high humidity taken into account, the construction of the basement ceiling / main level floor as well as the framing for the front and back porch will start on Thursday.
The front of the house showing the basement window for the exercise room.
Good view of the 'Lego' blocks... ;-)
Peek...
a boo!
Inside the ICF walls showing the plastic framing and horizontal and vertical rebar. 
Another look, now at an angle.
These are not vents, but actually support blocks for the back porch in this picture.

Saturday, July 16, 2011

Build - Day 5 and 6 - July 16/17, 2011

With our building crew being Amish you get lots of hard working people delivering solid quality work. You also get weekends off. I see nothing wrong with that since that's kind of how I like to operate and recouperate.

So, for today and tomorrow we wish all the followers of our blog a good weekend. C U Monday and until then, here are some more artsy ICF block pictures to carry all of us over...




Friday, July 15, 2011

Build - Day 4 - July 15, 2011

Today they started stacking the ICFs. They will finish that up either tomorrow or Monday and the basement wall pouring will start on Tuesday, exactly a week after breaking ground.

Here's an impression of today's progress...

The ICF blocks arrived around 7am this morning.

The first blocks are in!

ICF art.

We are now using Logix forms.

The forms come together quickly.

Progress by 11am.


Hard at work around noon.
The Logix ICF block

The dinette with the step-down due to the removal of the clay layer

The dinette view from the inside

Jobsite overview (from the in-law suite)

Thursday, July 14, 2011

Floored by Flooring Choices

We've been looking at flooring for a little while now but now that our house is officially under construction, we're feeling pretty motivated to make some decisions. Charis suggested that we talk to the folks at Bob & Pete's Flooring. D and I had actually randomly found their shop several weeks ago, and I was impressed by the staff, so I was happy to come back with Niels. Our son was such a trooper, we were there over two hours, through dinner and past bedtime, but he just played with Legos, sang, read books, made dinner in the toy kitchen. I am a very proud mommy. With the little one occupied, we were able to have a productive night.

Kitchen and Dinette: Cork
We knew from the start that we would use cork here. It's soft, warm, easy on the knees, low maintenance, green, anti-allergenic, insect resistant, and best of all, it reduces noise! I'd buy it for that reason alone!
The winner: Avante Garde Canyon by We Cork.
Cork in context
Mudroom, Foyer, Power Room, Family Bath, Guest Suite Bath, Master Suite Bath: Tile
We feel in love with Emser Strand 12x24 tile this past weekend at The Great Indoors. We love the suble clean lines on linen tiles. Bob & Pete's didn't have it in stock, but they did have Daltile's Fabrique, which is very similar.

We're thinking one of the whitish ones in the Suite Baths and one of the dark ones in the others. I'd really like to see 12x20 sample of all 5 to decide for sure, though.
Daltile Fabrique Creme Linen
Emser Strands Oyster
Emser Tile Olive
Daltile Gris Linen
Emser Tile Twilight
Great Room, Master Bedroom, D's Room and Upstairs Guest Room: Frise Carpet
If money were no object, we'd probably do all cork, at least downstairs. Alas, we have a budget, and carpet is an easy way to stretch. our floor allowance. The carpet we're considering is low VOC and made of recycled materials.
Leading carpet (forgot the name, but B&P have it) as it will transition to the kitchen/dining area.
Office and Guest Suite: Some sort of low pile carpet:
We're still working on this one, but it will be something that plays nice with office and wheel chairs.

Laundry Room and Pantry: Linoleum
As much as I'd love to do cork in pantry, it's hard to justify in a 9'x9' space. So we'll do linoleum instead. We'll use the same flooring in the upstairs laundry room. 
Leading linoleum option with Canyon Cork.
Kitchen Backsplash: Green (Recycled?) Glass Subway Tiles...I think.
I have no doubt that I have spent entirely too much time thinking about backsplash, especially since we don't even have one in our current house. With the transitional/modern bent to our kitchen, we don't have a lot of color, so I really wanted to bring in some sage green-ish color. I love the idea of recycled glass tile, but think the mosaics are too much stimulation for my injured brain, so I've been learning to a solid color. Niels doesn't care for the 1x1s, so we've been looking at subways and straight sets.

Last week, I got Niels hooked on these tiles:
Solistone Mardi Gras Carrollton. Those little lines in the tile give a little bit of color variance, but it's nice and subtle. 

Carrollton in context. Our kitchen will also have espresso cabs, white quartz counters, and stainless steel appliances. I just love it.
Unfortunately, Bob & Pete's didn't have this in stock, but the person we met with saw why we loved it and will try to track it down for us. We found this one, which is available in subway, as a distant second choice. I do like that it really looks like recycled glass bottles and is a just a little messier than most clean cut glass.
American Olean Solare Brooke
 Compilations:
Canyon Cork and Maple Espresso Cabs

Maple espresso cabs, Canyon cork, Cambria Whitney quartz and AO Solare Brook.
Daltile Gris Linen (top left, for foyer and mudroom), transitioning to great room carpet, transitioning to kitchen and dinette Canyon cork with maple espresso cabs. White Creme linen title (bottom left) for suite baths. 

Build - Day 3 - July 14, 2011

A low-key day today in 'the pit' with finishing the footer frames (incl. rebar) and the actual pouring of the footer concrete. They also added some of the gravel / pebble that will go under the basement floor.

Tomorrow they will finish up the back porch footers but more importantly, at 7:30am the Logix ICF blocks should arrive. If all goes well, the stacking of the 'Legos' should start around 1pm.

A lot is happening very, very rapidly in these first couple of days. We know that pace will slow down significantly as soon as the house is 'under roof', but for now I'm loving the fast pace of the build.

Here are a few pictures of the today's progress...
Amish-built

Front entrance view

In-law suite view

West view

Tomorrow they'll finish this up... I hope ;-)

Footers approved!